On average the renovation of a Bathroom could take 15-25 days or more, depending on the work required.
Renovating a whole bathroom takes time because different types of work must be done. For example Flooring, Plumbing, Electrical wiring, and Wall work. The size of the bathroom is also considered while remodeling because the more space we have the more time it takes to cover up.
How long does it take to renovate a bathroom and why?

A whole bathroom renovation usually takes 15-25 days on average, because of the multiple tasks the renovation requires an extended time period.
If you are remodeling a bathroom then these are the phase which includes in the whole process:
- Demolition (3-5 days)
- Groundwork/Plumbing (3-4 days)
- Tiling (5-7days)
- Finishing (2-3 days)
- Adding Features (3-4 days)
Demolition:
The first task of renovating a bathroom is demolishing the old bathroom structure. From old tiling to removing the ceiling, walls, shower, toilet, and electrical wiring. This whole process takes around 3-5 days or it could take more depending on the size of the bathroom.
Plumbing/ electrical work:
After demolition, the plumbing and electrical lining is the second most important part. Once the demolition is done you can see the current bathroom structure clearly. Now according to your remodeling plan, you can start with plumbing and electrical fitting. Make sure that you don’t miss out on anything because once the tiling is done, plumbing and electrical work will ruin your new bathroom.
Tiling/waterproofing
Once you are done with the structure work like plumbing and electrics, you can move on to the next step which is Tiling and Waterproofing. At this stage, new flooring tiles will be added to your bathroom and once the tiles are placed the waterproofing will take place. Waterproofing will provide long-lasting years of protection and save your bathroom from water leakage and damage.
Finishing:
After the waterproofing is done, your bathroom is ready for the next phase, finishing. Finishing is basically for removing all the dirt and mess of tiling and other work. Once the finishing is complete the bathroom is clean and ready for the next phase.
Adding Features:
The final stage is adding and installing features such as lighting, decor, shelves, shower, and toilet. Once you are done with this stage your bathroom is fully functional and completely done.
Note: The time period is not the same in every case, it highly depends on the situation. The size of your bathroom or the renovating style you have chosen can affect the time period. If you are doing renovation all by yourself then the time period is going to be way longer than a month cause all the work requires professional workers.
Final Thoughts:
Bathroom renovation is surely an important aspect of house remodeling which takes plenty of hard work and time. As I have mentioned above bathroom renovation usually takes a month and it could go longer than that. I hope this article will be helpful to you. Please visit Bathroom Remodeling for more ideas and if you have any queries please